When shingles are genuinely finished
Asphalt shingles fail in a recognizable way. They lose granules across every slope, not one patch. They go brittle, so a shingle cracks instead of bending when you lift it. Repairs stop holding and start showing up somewhere new a few months later.
All of that is visible from the air, which is why we fly the roof first. You look at the same photos we do and make the call yourself.
How the job runs
- Free drone inspection and photographs.
- A written price with those photographs attached.
- The old roof comes off down to the deck, and the decking gets checked.
- Any rotten decking is replaced.
- The new roof goes on.
- Nails are swept with magnets across the yard.
Common questions
Do you have to tear the old roof off?
The old roof comes off. Going over it hides the decking, adds weight, and means nobody finds the rot until it's much worse.
What happens if the decking is rotten?
It gets replaced. That possibility is flagged before the job starts, because it's the usual reason a job runs longer than planned.
How long will my house be open?
No more roof gets opened than can be dried in the same day.
If the roof isn't finished yet, a repair or maintenance is the cheaper answer, and we'll say so. See also roof decking replacement.

